Agricultural
XL planning were employed to cover an existing silage clamp with a new building for the client. This was to help reduce grey water run off from the baled silage and reduce plastic as the bales would not need to be covered to be stored. The location against the main road meant that the building had to be well designed due to its fairly prominent position.